About the project

Polish construction company BUDIMEX contracted ADELTE to deliver in autumn 2014 a HYDRA Passenger Boarding Bridge on the new ferry berth at port of Swinoujscie. The new SPBB will serve ferries with sail to the port of Ystad in Sweden of up to 220 m in length and ensure total comfort and safety for passengers. This is ADELTE’s first project for a SPBB in Poland.
This unconventional Passenger Boarding Bridge will adapt to the unique characteristics of the port of Swinoujscie, enabling passengers to transit safely and comfortably from an exceptionally high elevated walkway to the ferry ships’ doors. With tunnels 3.6 m wide, the HYDRA SPBB will improve the terminal’s logistics, providing enough capacity to absorb large passenger flows while ensuring uninterrupted quayside traffic.
Installation
2014
Client
Budimex Construction
Location
Świnoujście, Poland

Get our Reference List

Discover our Passenger Boarding Bridges projects
at Airports around the world

* These fields are required.


Explore recent projects

ADELTE has extensive experience in the design, manufacture, installation and
maintenance of PBBs at airport, cruise and ferry terminals around the world