About the project

Port Authority of Quintana Roo contracted ADELTE in January 2009 to design and construct two PEGASUS PBBs to facilitate ferry passengers ease of access and egress via the second floor of a new Ferry Terminal, located downtown San Miguel de Cozumel, next to the Punta Langosta Cruise Ship Pier. The PBBs were inaugurated in June 2010.
The PBBs of the PEGASUS range will consist of a short tunnel section and a sophisticated cabin and docking ramp. The PBBs have an electromechanical elevation system and are able to move on rails along the whole pier.
Instalación
2010
Cliente
Adm. Portuaria de Quintana Roo
Ubicación
Cozumel, México

Project Gallery