Skip to content

Installation

ADELTE contracted by Port Miami (Miami Dade County) installed two symmetrical SEDNA-type SPBBs for NCL’s new Cruise Terminal B and one SEDNA-type SPBB for Cruise Terminal C. The two SPBBs for Cruise Terminal B were delivered in time for the inauguration of NCL’s new iconic terminal, which is known as the “Pearl of Miami”. All three SPBBs are capable to operate with the current and future cruise vessels, including those with overhanging lifeboats. In 2020, Port Miami have a total of eight ADELTE SPBBs in operation at the cruise terminals B, C, D and F.

Emplacement
Miami, États-Unis

Galerie d'images

Get our Reference List

Discover our Passenger Boarding Bridges projects
at Airports around the world

* These fields are required.

Explore recent projects

ADELTE has extensive experience in the design, manufacture, installation and
maintenance of PBBs at airport, cruise and ferry terminals around the world

Barcelone – Muelle Adosado Terminal D (Palacruceros) II

Boston – Raymond L. Flynn Black Falcon Cruise Terminal II

Seattle – Smith Cove Cruise Terminal

Aéroport de Manchester – Terminal 2 · Jetée 2